PROJECT UPDATE:
Woodlands PS & Community! Together we smashed our fundraising goal! We now have a total of $46,721.25 to spend on our Nature Play Space!!! That means we raised an incredible $16,721.25 in our funding drive alone!!! Thank You for all of those who supported this project over the years and for those who donated to the funding drive!
Upgrades have been incorporated into the plans and the installation start date has been moved up to Monday 17Th OCT!!!!!!
Raffle prizes will be drawn and announced this Friday 15th October!
For every $20 you donated your name will go into a draw to win some great prizes.
-
3 x Prizes of $100 Gift Voucher of your choice from either:
Karrinyup Shops, EB GAMES, SMIGGLE, or REBEL SPORTS!
-
5 x Gift Hampers
-
Plus heaps more!

Updated
Plans:
Donate to Phase 2 of this Project:
Direct Deposit Donations:
Direct Deposit Donations:
To the Woodlands P&C Account (not the school account)
Account Name: Woodlands P&C Assoc
BSB: 016-334
Account #: 3409-59357
Your Name and "NaturePlay2" in the reference
.jpeg)
CASH DONATIONS:
Cash Donations:
Place all cash donations in a clearly marked envelope to the Woodlands P&C and write "Nature Play 2" on the front and your return information on the back. You can drop off envelopes to the P&C drop box in the school office during office hours.
.jpeg)
OUR GO FUND ME PAGE:
Our Go Fund Me Page:
Visit our Go fund Me Page: Fundraiser by Woodlands Primary School PandC ASSOC : Nature Play Space Funding Drive For Woodlands PS (gofundme.com)
Let us know what you think!
Visit our installers website gallery, or better yet, visit one of the playgrounds they have installed around Perth and let us know if there are any elements that you like for phase 2. examples and locations of their other work by visiting www.naturebasedplay.com.au
The Design & installation by Department Approved Contractor: Nature-Based Play.
PHASE 2 Installation start date: TBA Pending Grant funding and consultation from Aboriginal artists for cultural elements.
Please email your suggestions and feedback to nadiabowey@hotmail.com "Nature Play Space 2" in the subject!
Project Gallery:
![]() | ![]() |
|---|---|
![]() | ![]() |
![]() Project Gallery | ![]() |
![]() | ![]() |
Project Details & Background
In 2017/2018 a renewal project was planned for the ECE outdoor areas at WPS with the aim to achieve a more inviting and stimulating outdoor environment using nature based elements throughout the concept plan. The renewal project was driven by the Grounds Committee and planned in consultation with the ECE staff, NQS committee, School Board, P&C and Cure Landscaping. Budget allocations were made by the school grounds committee and the P&C. Funding grants were also applied for based on this plan but unfortunately we were not successful in our grant requests. As a result, only a portion of the project was funded (Kindy area and the bike path area in front of the kindy gates). There were very limited funds left for the central area and the logs were installed in the area as a starting point. The intent was to keep adding nature themed elements to the area based on the concept plan as funding became available. The P&C has been fundraising since 2018 with the intent of allocating funds towards this project however, from 2019 the grounds committee became inactive, and the project stalled. Last year at the P&C's EGM the P&C recommitted to this project. The department referred the school to Nature Based Play who consulted directly with the school to design concept plans in line with Department standards. A lot of time, effort and planning went into this project over the years. With YOUR HELP this project can finally be realised to it's full potential. Thank you for your support in getting the best result for our school and community.